Planning Method

From InfiniteERP Wiki
Revision as of 18:12, 19 October 2018 by Wikiadmin (talk | contribs) (Created page with "{{BackTo|Material Requirement Planning}} === Introduction === Define how transaction types will be dealt with in the application. {{ManualDoc:W800094}} === Header === Crea...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
Back button.png   Back to Material Requirement Planning


Introduction

Define how transaction types will be dealt with in the application.

Template:ManualDoc:W800094

Header

Create a planning method.

Template:ManualDoc:T800252

Lines

Add transactions to be included in your plan. Each transaction is shown on its own line.

Template:ManualDoc:T800253



Full list of Planning Method window fields and their descriptions is available in the Planning Method Screen Reference.

Back button.png   Back to Material Requirement Planning