Template:ManualDoc:T800114

From InfiniteERP Wiki
Jump to: navigation, search

WS800114.png

  • The Movement Date, Starting Time and Ending Time indicate on which date and during which shift the production took place.
  • The Create Standards button (displayed in the "Production Run" tab) is used to execute the process that loads all the P- and P+ information as well as global used products, machines, salary categories, indirect cost, toolsets. When the standards are created, also stock of all P- products is checked and an error appears if any products do not have stock. For the Create Standards process to complete successfully, the Completed Quantity has to be greater than zero.
  • Once the standards are created and all the correct information concerning the production is entered, the work effort is validated by clicking the Validate Work Effort button. At this point the stock information will be updated.
  • Optionally the Work Effort can be posted to the general ledger journal once the configuration is added. Information related to the cost of the raw material and produced products is posted:

ProdWS800114.png