Post in work effort

From InfiniteERP Wiki
Jump to: navigation, search

Test plan

01. Create two products.

  -Product A Consumed, Stocked = No, Production = Yes


  -Product B Produced, Stocked = Yes, Production = Yes


02. Under Costing tab, add a standard cost to it.
03. Add a storage bin to the Product A Consumed in Manufacturing tab
04. Create a Manufacturing Cost Center and create a version.
05. Create an Activity and assign the previous cost center to it.
06. Create a Process Plan, Version and Operation.
07. Add the previous created Activity to the Operation and set Create Standards to 'Y'.
08. Set the previously created products in the I/O Products tab of the Process Plan.
09. Create a Work Requirement and assign the previously created Process Plan and Process it.
10. Create a Work Effort from it.
11. Go to the Work Effort window, choose the record created and Validate it
12. Launch the costing background process.
13. Check that Posting of Work Effort record will be done successfully.

Jadi saya sudah test dengan no Work Effort 10000104 dengan kondisi semua parameter cost di test plan di atas ada isi nya bukan nol. hasil nya work effort bisa di post.
Saya juga sudah test dengan no work effort 10000105 dengan kondisi parameter post di test plan di isi nol hasil nya work effort tidak bisa di post dengan error yang sama.
Kesimpulanya Untuk post di work effort parameter cost harus di isi tidak boleh nol atau null
Dengan kesimpulan di atas maka untuk proses void jika production nya menggunakan bill of material production maka record void yang terbentuk juga di windows bill of material production.
Untuk menunjang kesimpulan di atas saya sudah cek perbedaan di table M_production anatara bill of material production dan work effort hanya berbeda issotrx
berdasarkan test plant di atas parameter harus ada pada saat post cost center dan manufakturing harus ada nilai cost nya. Pada work effort parameter tersebut ada pada table m_production_plan. M_production_plan Bill of material production adalah tab Production Plan sedangkan di work effort adalah tab Production Run.

Perbedaan pada table production plan
1. Bill of material production tidak ada cost center dan hasil nya bisa di post.

2. Work Effort yang konfigurasi manucfacturing cost center nya bener akan bisa di post di field cost cester pada table production_plan ter record id Cost center version.

3. Work Effort yang konfigurasi manucfacturing cost center nya tidak bener tidak bisa di post, di field cost center pada table production_plan tidak ter record id Cost center versionnya.