Template:ManualDoc:T800158

From InfiniteERP Wiki
Jump to: navigation, search

The date and shift during which a particular quality control point is documented, as well as the time when the check took place. Also a contact name is entered:

WS800158.png
The Create CCP button is used to automatically populate the information in the Check Point Set and Time tabs about the check(s) that are configured to take place during the selected shift.

Once the above action has been executed, the Edit CCP Measured Values button appears. When clicked a popup appears in which the value of the check is entered:

Production26.png
After entering the value and clicking the ok button, the entered value appears in the Values tab.

Once the value has been entered this way, the Input Time Measurement button appear. When clicked a popup appears to process the information entered in the time tab:

Production27.png