Template:ManualDoc:W800052

From InfiniteERP Wiki
Jump to: navigation, search

A work requirement is a document indicating what has to be produced and by what date. The work requirement is created based on a process plan. The operations with the related details are populated in the work requirement. Once the operations are populated, the information can be overwritten if needed.

A work requirement can be created in two ways:

  • manually in the screen
  • automatically as an outcome of the manufacturing plan in MRP.