Template:ManualDoc:T800112

From InfiniteERP Wiki
Revision as of 22:01, 19 November 2021 by Wikiadmin (talk | contribs) (Created page with "After '''processing''' the Work Requirement, the information in the operation tab is '''populated from the Process Plan'''. The main tab of the Work Requirement is showing tha...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

After processing the Work Requirement, the information in the operation tab is populated from the Process Plan. The main tab of the Work Requirement is showing that the Work Requirement is processed and the Estimated Time is showing the total of estimated times of all operations.

Production5.png

The fields in these two tabs were mostly taken from the Process Plan, but can be overwritten in the Work Requirement. For a description of these fields, please see the Process Plan section.

The Starting Date and Ending Date of the operations are defaulting from the main tab of the Work Requirement, but can be overwritten.
The Estimated Time on the operation is calculated using the formula: estimated time of the operation taken from the process plan x quantity on the operation.
The Run Time information is populated based on total actual hours populated from the Work Effort for the operation.
Close Phase: With this process it will be closed the work requirement phase. If all the phases are closed the work requirement will also be closed.